Power Maintenance – Sunday 20th Dec 2009
Coreix :: Power Maintenance – Sunday 20th Dec 2009
Location: STA.LON2
———————
The facility engineering team will be conducting power maintenance beginning at 02:00 GMT lasting until 06:00 on Sunday 20th Dec 2009.
Scope of work: Functional test of the new enhanced solution.
The commercial supply will be disconnected in a controlled manner by power engineers. This work will ensure the correct operation of the breakers in the Low Voltage equipment in switching the power source on to the Generators. A full risk assessment has been carried out and as an additional precaution; manufacturers will be onsite along with our data-centre engineers.
Outage: Non-service impacting activity, we do not anticipate any downtime during this testing.
Thank you for your understanding as we continue to improve our services.
_____________________________
STATUS UPDATE
We have successfully completed the scheduled maintenance.

