Scheduled
Coreix Ltd will be conducting essential upgrades to its Network Services. This has been designated as essential. The nature of this work is to perform Network element upgrades.

The preventative maintenance will take place over a period of no more than eight (8) hours.

Downtime is expected: This will affect live/public services with three to four small disruptions of 2-3 minutes. But can be up to 15 minutes during the maintenance window.

Planned Maintenance summary:

Upgrading the software on ENFIELD Metro Switches to support new features and improve stability. This will be done by removing the traffic from each Metro Switch. Then moving the links to an upgraded switch and re-enabling the traffic.

Migrating Edge2 Switch to our new Metro platform to improve stability. This will be done by moving a pair of uplinks to the new platform and moving traffic from the old to the new Metro Network. Once the connectivity has been confirmed to all Edge2 customers, then moving the second pair of uplinks. Enabling load balancing between the uplinks for better throughput and redundancy .


We apologise for the inconvenience caused, but necessary maintenance is often unavoidable in the effort to be pro-active.

Should you experience any difficulties in this period the Support Team will be available by emailing support@coreix.net & creating a ticket.

We will update you upon completion of the task planned, marking this notification as "Resolved" on the status page.
Posted Sep 11, 2020 - 10:39 BST